Fixing It Cost Less Than Replacing It

Cone Crusher had a failure which might have meant scrapping the unit. But OPS rebuilt the chamber for approximately 19% of the cost of replacement.

By |2018-03-12T16:41:30+00:00January 17th, 2018|Case Study|Comments Off on Fixing It Cost Less Than Replacing It

Mobile Plant Instead of Costly Upgrades

The client wanted to increase gold production however the cost to upgrade the fixed crushing circuit or mill was prohibitive. So OPS provided a mobile crushing circuit.

By |2018-01-17T11:51:42+00:00January 17th, 2018|Case Study|Comments Off on Mobile Plant Instead of Costly Upgrades

The Right Equipment Makes the Difference

The client needed a solution to crush and screen existing stockpiles of already crushed Basalt. Their current equipment was not able to screen out all the required sizes.

By |2018-03-12T16:53:49+00:00January 17th, 2018|Case Study|Comments Off on The Right Equipment Makes the Difference